BIM Coordination and Clash Detection Services
Find and fix design conflicts in the model, not on site.
Why BIM Coordination Matters
When architecture, structure and MEP are designed separately, services often collide with beams, ducts clash with pipes and clearances get missed. Fixing these problems on site is slow and expensive. Fixing them in the model costs a fraction of that.
Our BIM coordination service brings every discipline model together, checks them against each other and gives your team a clear list of issues to resolve.
What Our Service Includes
- Federated model set-up: We combine architectural, structural and MEP models into one coordinated model.
- Clash detection: We run automated checks in Navisworks to find hard clashes (objects occupying the same space) and soft clashes (clearance and access problems).
- Issue reporting: Each issue is logged with a location, a screenshot, the disciplines involved and a recommended owner.
- Coordination meetings: We prepare model views and clash reports for your regular review sessions.
- Tracking to closure: We re-run checks as models update, so you can see which issues are resolved and which remain.
Our Coordination Process
- 1
Agree the coordination rules
Responsibilities, tolerances, clash tests and meeting rhythm are set out in the BIM Execution Plan.
- 2
Collect models
Each discipline uploads its model to the CDE.
- 3
Run clash tests
We test disciplines against each other and filter out noise, so you see real issues.
- 4
Report and review
You receive a clear issue log and annotated views.
- 5
Re-check
We repeat the cycle until the model is coordinated for issue.
Who Benefits
- Contractors
- fewer site changes and cleaner installation sequences
- MEP engineers
- better routes and clearances before fabrication
- Architects
- confidence that the design works in three dimensions
- Project managers
- clearer risk tracking and fewer late surprises
Works Best With Accurate Base Models
Coordination is only as good as the models behind it. For existing buildings, we can start with a Scan to BIM model so new work is checked against the real building. For new builds, our 3D BIM modelling keeps every discipline to a common standard.
Frequently Asked Questions
What is a clash in BIM?
A clash is a conflict between two model elements. A hard clash means two elements physically overlap, such as a duct passing through a beam. A soft clash means an element violates required clearance or access space.
Which software do you use?
We use Autodesk Navisworks for federated model checking, alongside Revit and your CDE.
Can you coordinate models that other teams created?
Yes. We can review models from other consultants, provided they are shared in agreed formats and follow the project’s naming and coordinate standards.
How often should coordination take place?
Most teams review at regular intervals set out in the BIM Execution Plan, with more frequent checks at busy design stages.
Get Your Models Coordinated
Send us your models or project brief and we will reply with a scope and quote. Contact us.